Sandbox

Build your own scenario.

Mix breakers, fuses, LVPCBs, and damage curves on a single TCC. The plot detects coordination overlaps automatically — flagged in red where two device curves cross.

Educational tool only. Generic representative curves, not manufacturer data. Don't use this for real coordination studies, breaker selection, or AHJ submissions — use a licensed production tool and a qualified protection engineer for any real-world decision.

The current sandbox seed: 1600 A LVPCB main, 400 A TM MCCB feeder, 100 A RK5 fuse branch. Clean selective coordination across the LV range.

1101001k10k100k0.010.11101001kCurrent (A)Time (s)Sandbox — Default — selective LVPCB / MCCB / fuse cascadeMain · 1600 A LVPCBFeeder · 400 A TM MCCBBranch · 100 A RK5 fuse
Main · 1600 A LVPCB

Long-time (L)

Short-time (S)

Instantaneous (I)

Feeder · 400 A TM MCCB
Branch · 100 A RK5 fuse
Class RK5 · general-purpose dual-element time-delay

3 devices on the plot.